Montgomery, Texas · May–Oct 2026
April Sound
A full backyard with a pool, built in phases — tree removal, grading, the pool, then the hardscape.
This backyard took months on the calendar, and most of that was waiting on purpose.
The yard had to come apart before it could come together: trees out first, then grading to set the levels the rest of the build would sit on. Then the pool. The hardscape came last, once the heavy equipment was out of the yard — nothing we build belongs under a set of tracks.
That is what phasing a backyard looks like. Rushing it would have meant building twice.
Start to finish
More projects
Camp Creek
A lakefront hillside held back with two Keystone walls, stone stairs down the slope and a flagstone path.
See the projectDock Access
Riverfront steps down to the dock.
See the projectHouse Site Wall
A 180-foot retaining wall on a house site.
See the projectGot a site like this?
Send photos and we will tell you what it needs. Free estimate, priced on site.
Or call 832-757-0827